Prerequisites for Master Data Distribution in SAP ECC in Integration Hub

Prerequisites for Master Data Distribution in SAP ECC in Integration Hub

    1. You have installed Intercompany and Integration Hub Solutions.
    2. You have set up your technical system landscape, connecting to SAP Business One system(s) and SAP ECC.
    3. You have tested the technical connections.
    4. Copy the scenario steps of the package to your namespace and adjust the definitions.

For more information about setting up your technical system landscape, refer the Setting Up the System Landscape for SAP ECC Knowledge article.


Next Step: Configuration for Master Data Distribution in SAP ECC in Integration Hub